Sawing

The production itself starts with the commissioning of all the required slabs.

The BDE-Dialog shows all slabs to the operator, all slabs he must provide in his shift or for the day.

Through in top nested slabs and the produce date the list will be automatically filled.

Remnants get automatically the status „accessible“ for further nesting in top.

Saws can get slabs manual or automatically loaded. (NC-Programs included)

The operator can – if needed - modify a NC-Program

After Sawing all parts get the status „SAWED“